Track quality achieved on HSL-South
Summary
Reduction of short-wave irregularities cuts life cycle-costs: From 2008, High-speed trains will be running on the Dutch HSL-South. During construction and testing of the line, a special focus has been placed on the assessment of the track geometry in the short-wave and, in order to prevent quick track deterioration and to reduce maintenance Life Cycle Cost.